EMPLOYER |
: |
FEKA CONSTRUCTION INDUSTRY AND TRADE INC. |
SUB-CONTRACTOR |
: |
ON-KA TOURISM, CONSTRUCTION, INDUSTRY AND TRADING INC. |
LOCATION OF THE PROJECT |
: |
TRIPOLI (AL-FATEH) UNIVERSITY / TRIPOLI LİBYA |
PROJECT NAME |
: |
Masonry works, water insulation with memrane, leveling concrete of sloped roof, workmanship of surface |
CONTRACT NAME |
: |
9/24/2008 |
PROJECT START DATE |
: |
1/1/2009 |
COMPLETION DATE |
: |
1/15/2010 |
|
|
|
|
|
|
|
|
|
|
|
Faculty of mathematics and statistics
|
|
|
Faculty of mathematics and statistics
|
|
|
Faculty of mathematics and statistics
|
|
|
Faculty of mathematics and statistics
|
|
|
Faculty of mathematics and statistics
|
|
|
Faculty of mathematics and statistics
|
|
|
Faculty of mathematics and statistics
|
|
|
Faculty of mathematics and statistics
|
|
|
Faculty of mathematics and statistics
|
|
|
Faculty of mathematics and statistics
|
|
|
|
CIS PROJECT - AFGHANISTAN
|
EMPLOYER |
: |
FEKA İNŞAAT SANAYİ VE TİCARET A.Ş. |
CLIENT |
: |
Nato Support Agency (NSPA) |
LOCATION OF THE PROJECT |
: |
Kabul - Afghanistan |
PROJECT NAME |
: |
Provision of Consolidated and Integrated CIS Hardened Facility at Kabul |
CONSTRUCTION TECHNIQUE EMPLOYED |
: |
All Types of Concrete and rough construction works |
CONTRACT |
: |
08.31.2012 |
COMPLETION DATE |
: |
12.15.2012 |
|
|
|
ECP PROJECT - AFGHANISTAN
|
EMPLOYER |
: |
FEKA İNŞAAT SANAYİ VE TİCARET A.Ş. |
CLIENT |
: |
Nato Support Agency (NSPA) |
LOCATION OF THE PROJECT |
: |
Kabul - Afganistan |
PROJECT NAME |
: |
Construction of Rear ECP at HQ ISAF |
CONSTRUCTION TECHNIQUE EMPLOYED |
: |
All Types of Concrete and rough construction works |
CONTRACT DATE |
: |
08.13.2012 |
COMPLETION DATE |
: |
03.17.2013 |
|
|
|
PALATIAL MANSION PROJECT - BODRUM / MUGLA
|
EMPLOYER |
: |
AGT GAYRİMENKUL YAT. TUR. A.Ş. |
SUB-CONTRACTOR |
: |
ON-KA TURİZM İNŞAAT TAAHHÜT SANAYİ VE TİCARET LTD. ŞTİ. |
LOCATION OF THE PROJECT |
: |
BODRUM - MUĞLA |
PROJECT NAME |
: |
Retaining wall, swimming pools, water treatment building and water tank |
CONTRACT DATE |
: |
12-14-2011 |
COMPLETION DATE |
: |
12-30-2012 |
|
|
|
ILINKA 10 STORY BUILDING CONSTRUCTION (RUSSIA)
|
|
|
|
SLAVINA REGION VILLA CONSTRUCTION (RUSSIA)
|
|
|
|
BLACKSEA HIGHWAY PERSEMBE - BOLAMAN SECTION BRIDGE & VIADUCT CONSTRUCTION (TURKEY)
|
|
|
|
BLACKSEA HIGHWAY PERSEMBE BOLAMAN REGION ASARKAYASI TUNNEL CONSTRUCTION (TURKEY)
|
|
|
|
BURSA BELT HIGHWAY KARACABEY BRIDGED JUNCTION POINT RECRATIONAL CONSTRUCTION
|
EMPLOYER |
: |
GÜLSAN İNŞAAT SANAYİ TURİZM NAKLİYAT VE TİCARET A.Ş. |
SUB-CONTRACTOR |
: |
ON-KA TURİZM İNŞAAT TAAHHÜT SANAYİ VE TİCARET LTD. ŞTİ. |
LOCATION OF THE PROJECT |
: |
BURSA, TURKEY |
PROJECT NAME |
: |
Bursa Belt Highway Karacabey Bridged Junction Point Recrational Construction |
CONSTRUCTION TECHNIQUE EMPLOYED |
: |
All Types of Concrete and rough construction works |
PROJECT START DATE |
: |
11.09.2000 |
PROJECT START DATE |
: |
11.09.2000 |
COMPLETION DATE |
: |
11.23.2001 |
|
|
|
|
BANDIRMA DRINKING WATER PURIFICATION PLANT CONSTRUCTION FIRE RESISTANT PRODUCTS FACTORY (RUSSIA) FINANCIAL CRIMES POLICE DEPT. SERVICE BUILDING (RUSSIA) LIME FACTORY GALLERY CONSTRUCTION (RUSSIA) WEST SIBERIAN METALLURGY FACTORY (RUSSIA)
|
|
Fire Resistant Products Factory ABK Building (Russia)
|
|
|
Financial Crimes Police Dept. Service Building (Russia)
|
|
|
Lime Factory Gallery Construction (Russia)
|
|
|
|